In the Arturo Soria area, near the Arturo Soria metro, we present a new work. This property has 2 bedrooms and two bathrooms. As you enter the house we have a spacious living room with an integrated kitchen with lots of natural light, as it has large windows that lead to the terrace of the house. The rooms have a large storage capacity in their built-in wardrobes. The home is completed by a garage space in the same building.
The common areas of the urbanization are important, where you can enjoy its green areas with a swimming pool, a multipurpose room, which can be a gym, and a room to store bicycles. The kitchens are delivered furnished and equipped with high-end appliances. High quality materials have been used for construction and everything has been done with a very modern design. It has been ensured that all the rooms have a lot of natural light, so the house has a very cozy atmosphere. In the garages, pre-installation has been done to be able to install plugs for charging vehicles. As for the air conditioning of the apartments, the heating is underfloor heating and the air conditioning is ducted.
The area has an innumerable range of schools, both private and subsidized, nearby, it is a 10-minute walk away, there is the Sports Center San Juan Bautista, which has tennis courts and a swimming pool, is very close to a 11-a-side football field. In the vicinity there are also different clinics and the Nuestra Señora de América Hospital, as well as churches and the Parque Feliz Rodríguez de la Fuente, 7 minutes away. The most important supermarket chains have establishments less than 5 minutes away by car. Nearby is the Avenida La Paz metro, there are also multiple bus lines nearby.
Delivery is scheduled for October 2025, and there is a wide variety of 2 and 3 bedroom apartments
Prices subject to change without prior notice until the reservation contract is formalized
Prices do not include VAT (10%)
Payment method Reservation: €10,000 + VAT (10%)
Initial: 10% at the time of signing the private purchase and sale contract
In installments: 20% in quarterly payments during the works phase
Upon delivery: payment of the remaining 80% or subrogation of the corresponding mortgage debt by the buyer